Page 17 - Prelucrare metal
P. 17
I - 15

QUALITY CONTROL

After PWA receives a product, we set about assessing it using a com-
prehensive checklist (testing protocols) to ensure continuous quality
for the end user. Several test runs later, machines are prepared for
distribution. In Europe we take full responsibility for our products to
meet EU-standards.
All products are delivered complete with detailed operator manuals and
CE-compliancy checks.

Test run Checking quality with testing protocol. Quality control
   12   13   14   15   16   17   18   19   20   21   22